critical-path-css-demo

Above-the-fold CSS generation + inlining using Critical & Gulp

  • 所有者: addyosmani/critical-path-css-demo
  • 平台:
  • 许可证: Apache License 2.0
  • 分类:
  • 主题:
  • 喜欢:
    0
      比较:

Github星跟踪图

critical-path-css-demo

Generate and inline critical-path CSS example using Critical.

Live demo of before and after critical-path CSS generation and inlining.

PageSpeed Insights results of before and after

Before:

After:

WebPageTest results

Before:

After:

Great. So, what are your recommendations?

Use Critical for generating and inlining your critical-path CSS and loadCSS to
async load in your site-wide styles.

Why is critical-path CSS important?

CSS is required to construct the render tree for your pages and JavaScript will often block on CSS during initial construction of the page. You should ensure that any non-essential CSS is marked as non-critical (e.g. print and other media queries), and that the amount of critical CSS and the time to deliver it is as small as possible.

Why should critical-path CSS be inlined?

For best performance, you may want to consider inlining the critical CSS directly into the HTML document. This eliminates additional roundtrips in the critical path and if done correctly can be used to deliver a “one roundtrip” critical path length where only the HTML is a blocking resource.

Installation

$ cd critical-path-css-demo
$ npm install && bower install

Generating and inlining critical-path CSS

Note: There are two build commands available. This allows you to compare the difference
between the output of a normal build and the output with critical-path CSS.

The default (minify, concat) build for the project can be run with:

$ gulp

The complete (critical-path) build can be run with:

$ gulp critical

This performs the normal build, then generates and inlines critical-path CSS for the page. It automatically async loads in the site-wide styles using loadCSS as part of the workflow offered by the module.

Tutorial

Follow the next few lines to install and scaffold a project using Yeoman and Gulp:

$ mkdir myapp && cd myapp
$ npm install -g yo generator-gulp-webapp
$ yo gulp-webapp

# Select Bootstrap and say no to Modernizr & Sass

You should now have a valid set of source files, including a Gulpfile.js.

The first thing we're going to do is install the Critical module which can generate and inline your critical-path CSS for you.

This can be installed as follows:

$ cd myapp
$ npm install critical --save-dev

Great. Next, add a reference to Critical at the top of your Gulpfile.js:

var critical = require('critical');

We can now use it in our build process. Let's write a new task called critical.

Our workflow for critical-path CSS is to first run a normal build, which will generate the optimized CSS (dist/styles/main.css) and resources needed for our app. We pass the build command as the second argument below:

gulp.task('critical', ['build'], function () {

});

Next, we'll add in our configuration for the critical module:

gulp.task('critical', ['build'], function (cb) {
    critical.generate({
        inline: true,
        base: 'dist/',
        src: 'index.html',
        dest: 'dist/index-critical.html',
        minify: true,
        width: 320,
        height: 480
    });
});

That's it. You can now run gulp critical to generate a complete build where dist/index-critical.html will contain your final output files. Above I've passed in a width and height which represent the viewports I'm targeting with my above-the-fold CSS. minify ensures that the inlined CSS gets minified.

Disclaimer

Note that this sample project is just that - a sample. It does not demonstrate how well these tools and
techniques work on a complex site nor a site making heavy use of dynamic styles. Your mileage may vary
and I encourage testing the tools available before making a decision about whether Critical makes sense
for you.

主要指标

概览
名称与所有者addyosmani/critical-path-css-demo
主编程语言ApacheConf
编程语言ApacheConf (语言数: 4)
平台
许可证Apache License 2.0
所有者活动
创建于2014-06-10 22:01:31
推送于2021-04-26 20:08:23
最后一次提交
发布数2
最新版本名称v0.1.0 (发布于 2014-08-30 21:35:49)
第一版名称v0.0.1 (发布于 2014-07-11 17:21:20)
用户参与
星数536
关注者数15
派生数54
提交数68
已启用问题?
问题数8
打开的问题数6
拉请求数6
打开的拉请求数1
关闭的拉请求数1
项目设置
已启用Wiki?
已存档?
是复刻?
已锁定?
是镜像?
是私有?